ECONRG
Solar Water Heaters
Made in Europe
Who we are
ECONRG has been founded in 2011 which main service is supply and installation of solar water heater systems in Kazakhstan and CIS. We supply the most effective equipment of best quality at an affordable price.

We are manufacturers of ECONRG flat plate and tube collectors as well as official distributers and partners of Kingspan Environmental, Paw, Meibes, Huch EnTEC, Cordivari.
Our services
Solar collectors
Solar collector ECONRG (Europe), Kingspan Solar (Ireland), Thermomax, Varisol, FPW models. Types: vacuum tubes and flat plate.
Tanks
Huch EnTEC and Meibes, Germany
Cordivary, Italy
Teplobak, Ukraine
Modular pumping stations
Paw GmbH stations (Germany), SolarBloC, Solex, Friwa models with Grundfos and Wilo pumps, with or without heat exchangers.
Installation and service
Warranty of 10 years on installation and post-warranty service.
Our advantages
Team of professionals, practical experience since 2011. Certified staff and mobile crew
Payback period from 3 years, with rising tariffs, constant increase of saved money
№1 collectors in the world, of 95% efficiency, Solar KEYMARK, TÜV certificates, 10-year guarantee for supply and 20 years warranty for vacuum conservation in tubes
Caring for nature and future generations, due to reduced emissions and energy consumption
More than 100 successful projects around Kazakhstan
Most advanced equipment and comfort – hot water 24/7
ECONRG EFK flat plate collector
Quality
Manufactured by robotized equipment in Austria, 28000 m2 of production
Warranty
10 years, 50 years of stable work
Design
Suitable for any roof and building type. Mounting on any inclined and horizontal surface
Materials
High-quality selective absorber coating, double tempered glass of 3.2 mm, heat insulation of 70 mm
For private and industrial purposes

Private houses, buildings, greenhouses, thermal heat and power stations, factories, etc.
Scale
Mainly suitable for large heat power plants, power supply and heating facilities
Kingspan Thermomax HP 400 collector
Quality
Manufactured by robotized equipment in Ireland
Warranty
20 years guarantee on vacuum tubes, 5 years on the whole structure
Design
100% European technological design
Materials
Top quality anodized aluminum, copper, rubber seals, tempered glass that withstands hailstones
Fast assembly
1 collector is installed in 30 minutes with the most accurate assembly
Efficiency
95% efficiency, best in Europe among other analogues
Portfolio
Selected projects
Portfolio
International projects
SAUDI ARABIEN / Riyād realized 2011 | SOLAR DISTRICT HEATING
realized 2013
The world largest solar onroof plant
Operating since mid-2011 the 25.4 MWth solar district heating
plant has been providing heat for the Princess Nora Bint Abdul Rahman
University, which has a campus for 40.000 students, lecturers and
other staff. Its amenities include accommodation, research facilities
and a hospital.
Collector area
36.305 m²
Solar peak capacity
25.4 MWth
CO2 reduction
120.000.000 kg
Storage capacity
1.000.000 liters
SAUDI ARABIEN / Riyād realized 2011 | SOLAR DISTRICT HEATING
realized 2013
The world largest solar onroof plant
Operating since mid-2011 the 25.4 MWth solar district heating
plant has been providing heat for the Princess Nora Bint Abdul Rahman
University, which has a campus for 40.000 students, lecturers and
other staff. Its amenities include accommodation, research facilities
and a hospital.
Collector area
36.305 m²
Solar peak capacity
25.4 MWth
CO2 reduction
120.000.000 kg
Storage capacity
1.000.000 liters
SAUDI ARABIEN / Riyād realized 2011 | SOLAR DISTRICT HEATING
realized 2013
The world largest solar onroof plant
Operating since mid-2011 the 25.4 MWth solar district heating
plant has been providing heat for the Princess Nora Bint Abdul Rahman
University, which has a campus for 40.000 students, lecturers and
other staff. Its amenities include accommodation, research facilities
and a hospital.
Collector area
36.305 m²
Solar peak capacity
25.4 MWth
CO2 reduction
120.000.000 kg
Storage capacity
1.000.000 liters
CYPRUS / Hellenic Copper Mines Nicosia | PROCESS HEATING
realized 2013
This project is constructed as a pilot project, and aims to increase
copper extraction from the ore by using warmer leaching fluid heated
up by solar system instead of conventional heating source. The solar
system is a standalone system not connected to conventional heating
system. The system has been in operation since March 2013.
Collector area
764 m²
Solar peak capacity
534.8 kWth
CO2 reduction
2.500.000 kg
Storage capacity
100.000 liters
CYPRUS / Hellenic Copper Mines Nicosia | PROCESS HEATING
realized 2013
This project is constructed as a pilot project, and aims to increase
copper extraction from the ore by using warmer leaching fluid heated
up by solar system instead of conventional heating source. The solar
system is a standalone system not connected to conventional heating
system. The system has been in operation since March 2013.
Collector area
764 m²
Solar peak capacity
534.8 kWth
CO2 reduction
2.500.000 kg
Storage capacity
100.000 liters
CYPRUS / Hellenic Copper Mines Nicosia | PROCESS HEATING
realized 2013
This project is constructed as a pilot project, and aims to increase
copper extraction from the ore by using warmer leaching fluid heated
up by solar system instead of conventional heating source. The solar
system is a standalone system not connected to conventional heating
system. The system has been in operation since March 2013.
Collector area
764 m²
Solar peak capacity
534.8 kWth
CO2 reduction
2.500.000 kg
Storage capacity
100.000 liters
Suider Paarl, SOUTH AFRICA | PROCESS HEATING
realized 2015
In an effort to reduce production costs and increase its competiveness in a
market place, the Cape Town based „Cape Brewing Company", also known as
CBC, became the first brewery in South Africa to use solar thermal technology
to produce over 60% of its hot water demand from the sun. The beer brewing
process requires water temperatures of 85°C which was previously generated
by a traditional paraffin boiler. By using solar thermal energy, CBC has reduced
the associated energy costs by more than 50%, thereby significantly reducing
its carbon impact on the environment and now rightfully claiming that they are
producing South Africa's first "Green Beer".
Collector area
120 m²
Solar peak capacity
84 kWth
CO2 reduction
390.000 kg
Storage capacity
10.000 liters
Suider Paarl, SOUTH AFRICA | PROCESS HEATING
realized 2015
In an effort to reduce production costs and increase its competiveness in a
market place, the Cape Town based „Cape Brewing Company", also known as
CBC, became the first brewery in South Africa to use solar thermal technology
to produce over 60% of its hot water demand from the sun. The beer brewing
process requires water temperatures of 85°C which was previously generated
by a traditional paraffin boiler. By using solar thermal energy, CBC has reduced
the associated energy costs by more than 50%, thereby significantly reducing
its carbon impact on the environment and now rightfully claiming that they are
producing South Africa's first "Green Beer".
Collector area
120 m²
Solar peak capacity
84 kWth
CO2 reduction
390.000 kg
Storage capacity
10.000 liters
Suider Paarl, SOUTH AFRICA | PROCESS HEATING
realized 2015
In an effort to reduce production costs and increase its competiveness in a
market place, the Cape Town based „Cape Brewing Company", also known as
CBC, became the first brewery in South Africa to use solar thermal technology
to produce over 60% of its hot water demand from the sun. The beer brewing
process requires water temperatures of 85°C which was previously generated
by a traditional paraffin boiler. By using solar thermal energy, CBC has reduced
the associated energy costs by more than 50%, thereby significantly reducing
its carbon impact on the environment and now rightfully claiming that they are
producing South Africa's first "Green Beer".
Collector area
120 m²
Solar peak capacity
84 kWth
CO2 reduction
390.000 kg
Storage capacity
10.000 liters
Maria Gail, AUSTRIA | SOLAR DISTRICT HEATING
realized 2015
The existing district heating plant (biomass) was expanded with a solar
thermal system for yearly support in heating and hot water supply in the
summer months for the surrounding objects residential home for the elderly,
primary school, kindergarten and community center including fire fighters.
The overall efficiency increased by the solar thermal plant and the start-up
losses of the biomass chamber could have been reduced.
Collector area
226 m²
Solar capacity
158,2 kWth
CO2 reduction
735.000 kg
Storage capacity
12.000 liters
Maria Gail, AUSTRIA | SOLAR DISTRICT HEATING
realized 2015
The existing district heating plant (biomass) was expanded with a solar
thermal system for yearly support in heating and hot water supply in the
summer months for the surrounding objects residential home for the elderly,
primary school, kindergarten and community center including fire fighters.
The overall efficiency increased by the solar thermal plant and the start-up
losses of the biomass chamber could have been reduced.
Collector area
226 m²
Solar capacity
158,2 kWth
CO2 reduction
735.000 kg
Storage capacity
12.000 liters
Maria Gail, AUSTRIA | SOLAR DISTRICT HEATING
realized 2015
The existing district heating plant (biomass) was expanded with a solar
thermal system for yearly support in heating and hot water supply in the
summer months for the surrounding objects residential home for the elderly,
primary school, kindergarten and community center including fire fighters.
The overall efficiency increased by the solar thermal plant and the start-up
losses of the biomass chamber could have been reduced.
Collector area
226 m²
Solar capacity
158,2 kWth
CO2 reduction
735.000 kg
Storage capacity
12.000 liters
Chemnitz, GERMANY | SOLAR DISTRICT HEATING
realized 2016
The facility increases the overall efficiency of the power center
Collector area
2230 m2
Solar peak capacity
1,561 kW
Storage capacity
1 000 000 l
CO2 reduction
7.3 million tons
Chemnitz, GERMANY | SOLAR DISTRICT HEATING
realized 2016
The facility increases the overall efficiency of the power center
Collector area
2230 m2
Solar peak capacity
1,561 kW
Storage capacity
1 000 000 l
CO2 reduction
7.3 million tons
Chemnitz, GERMANY | SOLAR DISTRICT HEATING
realized 2016
The facility increases the overall efficiency of the power center
Collector area
2230 m2
Solar peak capacity
1,561 kW
Storage capacity
1 000 000 l
CO2 reduction
7.3 million tons
Left
Right
Our objective is to introduce new standards of life
Albek Sarbassov, CEO
Our objective is to introduce new standards of life
Albek Sarbassov, CEO
Arguments for installing our systems
5 reasons to install solar water heater
· Think of our equipment an an investment in your new/future home

· You are tired of paying bills and every time limiting yourself to hot water use

· You are a modern person that uses new technologies today

· You not only believe, but also calculate the undeniable benefits of solar energy

· You love best and new that was created by mankind
5 benefits you get from purchasing our solar system
• Free hot water every day

• Independence from urban networks and rising tariffs

• Released funds in a few years = your earnings

• Technological and modern type of roof with collectors

• Awareness of your contribution to saving our Planet Earth
Send us your request
Tomorrow you will earn by the Sun
Every day the Sun allows us to save money on water heating. Use it now!
~
Or buy directly from our online store
Selection of standard packages or separate equipment
Send request
Describe maximum number of nuances for a more precise calculation
Name
Phone
E-mail
Type of client:
Amount of hot water consumed per day
Property location
Other comments
Not suitable vacancy? Describe your interest and send your resume to hr@ecoenergy.kz
Contacts:
We answer all your questions:
Sales: +7 7172 307-900
E-mail: info@ecoenergy.kz
VP29, 31/2 Saryarka ave, Astana, 010000, KZ
All photo and video materials belong to their owners and are used for demonstration purposes only. Please do not use them in commercial projects.
Made on
Tilda